• Main
  • Blog
  • How to Squeeze The Most Out of Demo Projects - Manufacturing Edition for Executives
How to Squeeze The Most Out of Demo Projects - Manufacturing Edition for Executives
This article is a call to action for executives and champions to rethink their approach, ensuring demo projects deliver maximum value and pave the way for transformative outcomes in manufacturing monitoring.
mdcplus.fi
26 May 2025

How to Squeeze The Most Out of Demo Projects - Manufacturing Edition for Executives

This article is a call to action for executives and champions to rethink their approach, ensuring demo projects deliver maximum value and pave the way for transformative outcomes in manufacturing monitoring.

Manufacturing monitoring systems are pivotal for achieving operational excellence, reducing downtime, and driving data-driven decisions. Demo projects, often structured as Proof of Concept (POC) initiatives, serve as critical stepping stones to test the feasibility of these systems before full-scale implementation. However, a concerning trend persists: many POC projects are ignored, undervalued, or dismissed as insignificant by decision-makers, squandering opportunities for innovation and growth. 

The Untapped Potential of Demo Projects

A POC in manufacturing monitoring typically involves deploying a small-scale version of a system—such as real-time data collection from IoT sensors, predictive maintenance algorithms, or Overall Equipment Effectiveness (OEE) dashboards—to demonstrate its feasibility and value. These projects are not meant to deliver polished solutions but to validate concepts, identify challenges, and provide a roadmap for scaling. When executed and evaluated effectively, demo projects can reveal insights into operational inefficiencies, workforce adoption, and technological integration, saving millions in potential missteps during full deployment.

Yet, many organizations fail to capitalize on these opportunities. POCs are often sidelined due to perceived lack of immediate ROI, unclear success metrics, or insufficient stakeholder engagement. Results may be dismissed as "not significant enough" because they don’t align with unrealistic expectations or because the project scope was too narrow to showcase transformative impact. This oversight risks stunting innovation, leaving manufacturers stuck with outdated processes while competitors surge ahead with smart factory solutions.

Why Demo Projects Are Undervalued - and How to Change That

Several factors contribute to the underappreciation of demo projects in manufacturing monitoring:

  • Lack of Clear Objectives: POCs often start with vague goals, such as "improve efficiency," without specific, measurable outcomes. This makes it hard to assess their true impact.
  • Misaligned Expectations: Executives may expect a POC to deliver production-ready results, overlooking its role as a feasibility test rather than a final product.
  • Limited Stakeholder Involvement: Without champions advocating for the project and engaging cross-functional teams, POCs can lack visibility and support.
  • Inadequate Evaluation: Results are often judged superficially—focusing on short-term metrics like cost rather than long-term potential such as scalability or workforce empowerment.

To address these issues, executives and champions must adopt a strategic approach to demo projects, ensuring they are designed, executed, and evaluated with rigor and purpose.

Strategies to Squeeze the Most Out of Demo Projects

Here’s how leaders can maximize the value of manufacturing monitoring demo projects and ensure their insights drive meaningful progress:

1. Set Clear, Aligned Objectives from the Start

Define what success looks like before the POC begins. Are you testing the accuracy of real-time data collection? The usability of a dashboard for operators? Or the potential for predictive maintenance to reduce downtime by 10%? Objectives should be SMART (Specific, Measurable, Achievable, Relevant, Time-bound). For instance, a POC might aim to "reduce machine downtime by 5% over a 30-day trial by implementing IoT sensor monitoring on a single production line." Clear goals ensure the project’s outcomes can be objectively evaluated and aligned with broader business priorities.

2. Engage Cross-Functional Teams and Champions

A POC’s success hinges on buy-in from all stakeholders—operators, maintenance teams, IT, and leadership. Appoint a champion to advocate for the project, bridge communication gaps, and ensure alignment. Involve shop floor workers early to gather practical insights and foster adoption. For example, a demo project testing a new OEE dashboard should include feedback from operators on its usability, not just data scientists evaluating its analytics. Cross-functional engagement ensures the POC addresses real-world pain points and builds a foundation for scaling.

 

 

3. Focus on Scalability and Long-Term Impact

While POCs are small-scale, their design should consider future scalability. Test systems that can integrate with existing ERP or MES platforms and handle increased data loads as production grows. Evaluate results not just for immediate gains but for their potential to transform operations at scale. A POC showing a 3% improvement in throughput on one line might seem modest, but if scalable across 10 lines, it could yield a 30% overall gain. Highlighting this potential helps justify further investment and prevents results from being dismissed as insignificant.

4. Leverage Real Data and Real Environments

A common pitfall is running POCs in isolated, controlled settings that don’t reflect the complexities of a live manufacturing environment. Use actual production data and real equipment to test the system’s performance under realistic conditions. For instance, a demo project for predictive maintenance should be tested on a machine with a history of failures, not a new one with minimal issues. Real-world testing ensures the POC’s results are credible and relevant, making it harder for stakeholders to ignore them.

5. Prioritize User Experience and Adoption

A technically sound system is useless if the workforce can’t or won’t use it. Design the POC with user experience in mind—intuitive interfaces, minimal training requirements, and clear value for operators. A demo project for a monitoring dashboard should allow workers to easily interpret data and act on alerts, not overwhelm them with complex visuals. Post-POC feedback from users can highlight adoption barriers, ensuring the final system is practical and effective.

6. Measure and Communicate Holistic Value

Don’t evaluate POCs solely on financial ROI. Consider qualitative benefits like improved decision-making, enhanced worker morale, or reduced risk of equipment failure. For example, a POC that enables faster response to machine alerts might not show immediate cost savings but could prevent a catastrophic failure costing millions. Create a comprehensive report that communicates both quantitative and qualitative outcomes to stakeholders, framing the results in terms of strategic goals like competitiveness and innovation.

7. Iterate and Build on Results

A POC is not a one-and-done exercise—it’s a starting point. Even if results are modest, use them to refine the approach and plan the next phase. A demo project showing limited success in predictive maintenance might reveal the need for better sensor placement or more robust algorithms. Treat these insights as opportunities to improve, not reasons to abandon the initiative. Iteration ensures continuous learning and builds momentum toward full implementation.

Case Study: Turning a “Dismissed” POC into a Game-Changer

Consider a mid-sized automotive parts manufacturer that launched a POC to test a real-time monitoring system for its assembly line. The initial results showed a 2% improvement in production efficiency over two weeks, but executives dismissed the project as “not impactful enough” and shelved it. However, a dedicated champion revisited the POC, noting that the system also reduced operator response time to issues by 15%—a metric not initially prioritized. By focusing on this outcome, the team scaled the system to three more lines, achieving a 10% overall efficiency gain and saving $500,000 annually in downtime costs. This example underscores the importance of digging deeper into POC results and advocating for their potential, even when initial impressions are underwhelming.

The Role of Executives and Champions

Executives must lead by example, fostering a culture that values experimentation and learning. Allocate sufficient resources—time, budget, and personnel—to ensure POCs are not treated as afterthoughts. Champions, meanwhile, should act as evangelists, ensuring the project’s purpose and outcomes are communicated effectively across the organization. Together, they can shift the narrative from “this POC isn’t significant” to “this POC is our blueprint for the future.”

Demo projects in manufacturing monitoring are not mere experiments—they are strategic tools to drive innovation, mitigate risks, and position your organization as a leader in Industry 4.0. By setting clear objectives, engaging teams, focusing on scalability, and evaluating results holistically, executives and champions can ensure these projects deliver actionable insights and pave the way for transformative change. Don’t let POCs be ignored or undervalued. Treat them as the critical first steps toward a smarter, more efficient manufacturing future—and act on their potential to achieve lasting impact.

 

About MDCplus

Our key features are real-time machine monitoring for swift issue resolution, power consumption tracking to promote sustainability, computerized maintenance management to reduce downtime, and vibration diagnostics for predictive maintenance. MDCplus's solutions are tailored for diverse industries, including aerospace, automotive, precision machining, and heavy industry. By delivering actionable insights and fostering seamless integration, we empower manufacturers to boost Overall Equipment Effectiveness (OEE), reduce operational costs, and achieve sustainable growth along with future planning.

 

Ready to increase your OEE, get clearer vision of your shop floor, and predict sustainably?

Copyright © 2025 MDCplus. All rights reserved