  • Fixing Late Starts and Early Stops: A Hidden Loss of Manufacturing
Fixing Late Starts and Early Stops: A Hidden Loss of Manufacturing
For plants running expensive CNCs or aerospace machining centers, that translates into crores of rupees in unrealized output. What’s often missing is a structured plan to tackle it.
mdcplus.fi
08 September 2025

Fixing Late Starts and Early Stops: A Hidden Loss of Manufacturing

For plants running expensive CNCs or aerospace machining centers, that translates into crores of rupees in unrealized output. What’s often missing is a structured plan to tackle it.

In India’s industrial landscape, especially in metalworking, machining, assembly, automotive and aerospace plants, lost minutes at the beginning and end of shifts quietly add up to a staggering waste. A 10–15 minute delay per shift might seem harmless, but across three shifts, 20 machines, and 250 working days, the loss equals thousands of productive hours every year. For plants running expensive CNCs or aerospace machining centers, that translates into crores of rupees in unrealized output.

This problem is not new. What’s often missing is a structured plan to tackle it, grounded in both data and the workplace realities of Indian factories.

Where the problem really comes from

  • Workforce culture: Informal grace periods, extended tea breaks, or a “chalta hai” attitude towards punctuality.
  • Management gaps: Supervisors arriving late, unclear shift handovers, or weak enforcement of rules.
  • Operational delays: Machines not ready, tools or raw materials missing, maintenance tasks pushed into production time.

Executives often default to blaming workers, but real-world data shows the loss is shared – roughly 40% of delays come from planning and system gaps, not just workforce discipline.

A strategy that works

The solution lies in combining data visibility, fair accountability, and process discipline. Here’s how:

  • Quantify the loss clearly: Convert minutes into machine hours and rupees. People argue with opinions, not with numbers.
  • Expose causes separately: Track whether the delay came from workers, supervisors, or material readiness. This makes accountability fair.
  • Make it visible: Dashboards or even printed charts showing shift start times make excuses harder.
  • Address mentality barriers: Counter the “10 minutes doesn’t matter” line with concrete financial impact.
  • Fix processes: Pre-stage materials, finish maintenance before shifts, shorten handovers with checklists.
  • Incentivize punctuality: Group-level bonuses and recognition boards push peer pressure to work in your favor.
  • Keep enforcement consistent: The same rule must apply across all teams and supervisors.

Executives need a practical timeline, not abstract promises. A phased rollout ensures the initiative sticks without sparking workforce resistance.

First 30 days – Data and awareness

  • Install or configure machine monitoring to capture actual start and stop times.
  • Compare machine ON time with official shift schedules.
  • Share initial reports with supervisors – avoid finger-pointing, focus on awareness.

Next 60 days – Pilot and process fixes

  • Run a pilot on one line or one department.
  • Identify the biggest delay causes – late workers, missing materials, or setups.
  • Introduce quick wins: stage materials before shift, enforce short handover checklists.
  • Launch small team-based incentives for on-time starts.

By 90 days – Scale and sustain

  • Expand monitoring and reporting across all departments.
  • Introduce consistent rules across shifts and supervisors.
  • Publish weekly or monthly performance dashboards.
  • Recognize teams with zero late starts – both financially and publicly.

The business case

This approach transforms punctuality from a soft “discipline” issue into a hard business case. Saving even 20 minutes per machine per day in a medium plant can free up 6,000+ productive hours per year – without any capital expenditure. That is equivalent to running several extra machines at zero investment.

The workforce also benefits. Clear rules, shared accountability, and small but consistent rewards create a more predictable and less stressful environment. Operators no longer waste time waiting for tools or approvals, and management no longer deals with avoidable delays.


Late starts and early stops are not just a nuisance – they are a silent killer of capacity in Indian manufacturing. Addressing them with structured data, fair accountability, and a 30-60-90 day plan is not just a productivity move, but a competitive advantage. Plants that fix this issue will deliver higher throughput without new machines, while competitors keep losing hours to a “10-minute gap” that quietly erodes their margins.

 

About MDCplus

Our key features are real-time machine monitoring for swift issue resolution, power consumption tracking to promote sustainability, computerized maintenance management to reduce downtime, and vibration diagnostics for predictive maintenance. MDCplus's solutions are tailored for diverse industries, including aerospace, automotive, precision machining, and heavy industry. By delivering actionable insights and fostering seamless integration, we empower manufacturers to boost Overall Equipment Effectiveness (OEE), reduce operational costs, and achieve sustainable growth along with future planning.

 

Ready to increase your OEE, get clearer vision of your shop floor, and predict sustainably?

Copyright © 2025 MDCplus. All rights reserved